Planning Tracks and Stops

Tramway extension Riebeckplatz / Hauptbahnhof to Halle-Neustadt, 2nd Main section, Halle / Saale, Germany

Tramway extension Riebeckplatz / Hauptbahnhof to Halle-Neustadt, 2nd Main section, Halle / Saale, Germany

 

In the course of the development of the Halle-Neustadt residential area a new tram route was constructed from the centre of the city of Halle to the outer edge of the residential area. The new tracks were partially integrated in the existing street area or in designated corridors in the street area of the residential area.

Description of project:

  • Construction of all track systems(partly รคs lawn track)
  • Construction of new traction power supply and overhead contact Systems
  • Construction and redirecting of all Underground cables
  • Conversion and construction of all stops (disabied access, passenger friendly)

Overall project value:
7 Mio. EUR

Name of client:
Hallesche Verkehrs-AG (HAVAG)

Dates (start/end):
2003-2005

Type of Services provided:

  • Draft and approval planning Design planning and call fortenders
  • Technological co-ordination and complex construction process planning
  • Local construction supervision

Light rail upgrading line 15, reconfiguration of Hauptbahnhofstop, Leipzig, Germany

Light rail upgrading line 15, reconfiguration of Hauptbahnhofstop, Leipzig, Germany

 

The Hauptbahnhof tram stop at Willy-Brandt-Platz is the most heavily frequented stop in the Leipzig tram network and the central alighting point for Leipzig main railway Station. In preparation for the Football World Cup 2006 in Leipzig the stop, all track systems surrounding it and the entire traction power supply system were converted with a new usage concept. A particularly complex task in this was the co-ordination of planning and construction with the work being conducted on the new Leipzig City Tunnel, the new light rail link through Leipzig city centre. The new roofing for the stop was designed in the course of an architectural competition.

Description of project:

  • Construction and conversion of all track systems, track turnings and track junctions
  • Construction and conversion of traction power supply and overhead contact systems
  • Construction and redirecting of all Underground cables
  • Construction of new roofing for tram stop and other tram stop equipment elements

Overall project value:
12 Mio. EUR

Name of client:
Leipziger Verkehrsbetriebe (LVB) GmbH

Dates (start/end):
2003-2006

Type of Services provided:

  • Technical, operational and economic feasibility study
  • Project co-ordination
  • Basic evaluation
  • Preliminary planning
  • Draft and approval planning
  • Subsidy management
  • Design planning and call for tenders
  • Site management and local site supervision

Planning Tram Depot

Planning Tram catenary

Planning Traction Power Supply